Week 024 — The Coming Soon Page and the Design Push
"A conversation about the project triggers a real launch step — the coming soon page goes live. Then a week of UI work: items page, header, footer, mobile and desktop."
"A conversation about the project triggers a real launch step — the coming soon page goes live. Then a week of UI work: items page, header, footer, mobile and desktop."
The found item flow completes for both paths — item reported lost and item not yet reported lost — and a map appears on the item page showing where the item was found.
Building the found item API backend — image resize working, data posting working, and a parade of small naming and mapping mistakes to track down.
Building the found item API backend, adding geolocation capture, getting HTTPS running in the dev environment, and a relative path bug hiding in plain sight.
Building the found item experience — returning options, QR code routing, user data refactored to support it — and a week of cascading design decisions.