srchParty Devlog

Posts

Week 024 — The Coming Soon Page and the Design Push

May 4, 2025

"A conversation about the project triggers a real launch step — the coming soon page goes live. Then a week of UI work: items page, header, footer, mobile and desktop."

Week 023 — Found, Both Ways

April 27, 2025

The found item flow completes for both paths — item reported lost and item not yet reported lost — and a map appears on the item page showing where the item was found.

Week 022 — The Found API, One Field at a Time

April 20, 2025

Building the found item API backend — image resize working, data posting working, and a parade of small naming and mapping mistakes to track down.

Week 021 — Geolocation, HTTPS, and a Relative Path

April 13, 2025

Building the found item API backend, adding geolocation capture, getting HTTPS running in the dev environment, and a relative path bug hiding in plain sight.

Week 020 — The Found Page Takes Shape

April 6, 2025

Building the found item experience — returning options, QR code routing, user data refactored to support it — and a week of cascading design decisions.

← Newer 13 / 17 Older →
Go->srchParty.com About
srchParty Devlog © 2026